Lhasa–Shigatse railway
railway line in China

The Lhasa–Shigatse railway, or Lari railway (Tibetan: ལྷ་གཞིས་ལྕགས་ལམ་) (simplified Chinese: 拉日铁路; traditional Chinese: 拉日鐵路; pinyin: Lārì Tiělù), is a high-elevation railway that connects Lhasa to Shigatse (Xigazê), in the Tibet Autonomous Region. The travel time between Lhasa and Shigatse on this line is roughly three hours.
History
The line was a spur line of the Qinghai–Tibet railway. The length of the railway is 253 km (157 mi). Construction began in September 2010 and was connected to the Qinghai–Tibet Railway in May 2013. The line was completed in July 2014 and opened for commercial operations on August 16, 2014. Soon after opening, the line became the primary mode of transport between Lhasa and Shigatse; the two destinations were previously only connected by road and air, and air travel was too expensive at the time for the large majority of local residents.
The exiled Central Tibetan Administration in Dharamsala has claimed that the rail line will dilute the cultural identity of Tibetans by accelerating the movement of Han migrants into Tibet.
Stations
The line includes 14 stations, of which only a few see regular passenger traffic (Qüxü, Rinbung). The project had a budget of 10.8 billion yuan.
The public source identifies “Lhasa–Shigatse railway” as railway line in China. This brief keeps that definition visible, then builds a research path around Lhasa, Shigatse and railway.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Lhasa–Shigatse railway”, the useful work is to connect “railway line in China” to the records capable of establishing context and consequence.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Mar 14, 2026. The linked authority identifier is Q6538521. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2010, 2013 and 2014.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Lhasa–Shigatse railway”, its source revision and the description used here.
- Expand the search: follow Lhasa–Shigatse railway primary sources, Lhasa–Shigatse railway archive and Lhasa research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Lhasa–Shigatse railway”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Lhasa–Shigatse railway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.