CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Eglinton East LRT

light rail line in Toronto, Canada

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionSep 20, 2026
Entity authorityQ7430301
Source-derived summary

The Eglinton East LRT (EELRT), also known as the Scarborough East Rapid Transit Line (SERT), formerly known as the Scarborough Malvern LRT, is a proposed light rail line intended to be part of the Toronto subway system in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough. It was originally part of Transit City, a 2007 plan to develop new light rail lines along several priority transit corridors in the city.

Unlike Line 5 Eglinton, which is a Metrolinx project, the EELRT is a City of Toronto project. In 2022, the plan was that the EELRT be designed and operated as a distinct service from Line 5 Eglinton; both would terminate at Kennedy station with no connecting track. In November 2023, the estimated cost of the EELRT was CA$4.65 billion, with construction expected to occur between 2027 and 2034 if the project were to be approved and funded.

History

Transit City initial proposal and cancellation

The Scarborough Malvern LRT was part of Toronto mayor David Miller's Transit City proposal announced on March 16, 2007, to be operated by the Toronto Transit Commission. This shorter 12-kilometre (7.5 mi) line was envisioned to terminate at Sheppard Avenue East and Morningside Avenue, where it would interchange with the proposed Sheppard East LRT. In 2008, the Scarborough Malvern LRT was included in Metrolinx's regional transportation plan The Big Move within that plan's 25-year horizon. In 2009, the initial design for the Scarborough Malvern LRT was completed. The design cut off west of Midland Avenue, leaving the question open for later design phases of how the line would interface with Kennedy station and whether the line would be an extension of Line 5 or a distinct service.

Editorial summary

Begin with the source’s own compact description: “Eglinton East LRT” is light rail line in Toronto, Canada. The dossier treats that line as a proposition to test through Eglinton, East and light, not as a finished interpretation.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current lead gives the account dated anchors—2007, 2022, 2023, 2027—that can be checked directly. The selected authority fields contribute no independent date. For this dossier, Eglinton, East and light is the immediate research focus.
Editorial analysis

Why this record matters

The phrase “light rail line in Toronto, Canada” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.

Evidence profile

Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Sep 20, 2026. The linked authority identifier is Q7430301. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2007, 2022, 2023 and 2027.

Critical limits

A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Eglinton East LRT”, its source revision and the description used here.
  2. Expand the search: follow Eglinton East LRT primary sources, Eglinton East LRT archive and Eglinton research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Eglinton East LRT”?
  2. What terminology or title could unlock a more precise catalogue search?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Eglinton East LRT” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.