Lake Turkana Wind Power Station
wind farm in Kenya

Lake Turkana Wind Power Project (LTWP) is a wind farm in Kenya. It is located in Loiyangalani District, in Marsabit County, approximately 545 kilometres (339 mi) by road north of Nairobi, Kenya's capital city. This wind farm location benefits from a persistent wind phenomenon called the Turkana jet.
The wind farm covers 160 square kilometres (40,000 acres) and has a capacity of 310 MW, enough to supply one million homes. It comprises 365 wind turbines, each with a capacity of 850 kilowatts. The associated overhead electric grid distribution system and a high voltage substation that connect it to the national grid.
The KSh70 billion wind farm is the single largest private investment in Kenya’s history and the biggest farm in Africa. The power produced is bought at a fixed price by Kenya Power (KPLC) over a 20-year period in accordance with the Power Purchase Agreement (PPA) with the latter. The project was completed in January 2017, however the line evacuating the power generated was not completed until July 2019.
Location
The wind farm is located approximately 50 kilometres (31 mi), north of the town of South Horr, in Loyiangalani sub-county, in the extreme western part of Marsabit County, in the former Eastern Province.
This brief starts where responsible research should: with the source description of “Lake Turkana Wind Power Station” as wind farm in Kenya. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as wind farm in Kenya. Its deeper value depends on whether names, dates, institutions and citations support that framing.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jul 27, 2025. The linked authority identifier is Q16746823. Authority coordinates are 2.600, 36.900. 1 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2017 and 2019.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Lake Turkana Wind Power Station”, its source revision and the description used here.
- Expand the search: follow Lake Turkana Wind Power Station primary sources, Lake Turkana Wind Power Station archive and Lake research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Lake Turkana Wind Power Station”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Lake Turkana Wind Power Station” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.