Pink Line (Jaipur Metro)
line of the Jaipur Metro, India

The Pink Line of the Jaipur Metro is part of the rapid transit system in the city of Jaipur, India. It is also called East-West Corridor of Jaipur. It consists of 11 metro stations from Mansarovar in the West to Badi Chaupar in the East. The line with a length of 11.97 kilometers (7.44 mi) is mostly elevated and partially underground and has been laid to connect the oldest part of Jaipur to rest of it.
This is the Metro line that got flagged off on 3 June 2015, and has been named as Pink Line, as the line passes through the Pink City.
The Pink line has planned interchange with the Orange Line of the Jaipur Metro. it also connects Mansarovar, the Largest Colony of Asia with the Jaipur Junction railway station of the Indian Railways, Sindhi Camp Bus Stand, Heritage Sites like Hawa Mahal, Town Hall, Jantar Mantar, City Palace etc.
History
The following dates represent the dates the section opened to the public, not the private inauguration.
Route
Phase-I B extension
Under Phase-I B, the Pink Line was extended further East from Chandpole station by 2.349 km. Two additional stations got built to extend the line to Badi Chaupar.
“Pink Line (Jaipur Metro)” enters the record as line of the Jaipur Metro, India. Crown Archives preserves that source wording while asking what Pink, Line and Jaipur can confirm, complicate or overturn.
Why this record matters
“Pink Line (Jaipur Metro)” is worth following because a concise public description often conceals a longer documentary argument. Here, Pink, Line and Jaipur provides the most credible route into that argument.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Sep 11, 2026. The linked authority identifier is Q17053988. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2015.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Pink Line (Jaipur Metro)”, its source revision and the description used here.
- Expand the search: follow Pink Line (Jaipur Metro) primary sources, Pink Line (Jaipur Metro) archive and Pink research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Pink Line (Jaipur Metro)”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Pink Line (Jaipur Metro)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.