Marina Bay Cruise Centre Singapore
cruise terminal in Singapore

The Marina Bay Cruise Centre Singapore (MBCCS) is a cruise terminal in Singapore, located at Marina South. The construction of the S$500 million terminal began in October 2009 and was completed on 22 May 2012. It received its first ship, the Voyager of the Seas, on 26 May 2012. The official opening ceremony of MBCCS was held on 22 October that year.
The terminal is operated by SATS-Creuers Cruise Services (a joint venture of SATS Ltd and Creuers del Port de Barcelona). The Singapore Cruise Centre at HarbourFront is set to be consolidated with MBCCS to form a cruise hub as the leisure cruise sector continues to grow in Singapore.
History
The impetus for construction came from difficulties many cruise operators had with the current Singapore Cruise Centre which is in a narrow channel with a dead end. The geographical limitations of the site impose height and berth limits on the cruise operators. The new location at Marina South has deep waters, a large turning basin, and no height restrictions, which enables it to accommodate the largest cruise ships being built now.
On 18 March 2009, the Ministry of Trade and Industry (MTI) and Singapore Tourism Board (STB) revealed the cruise terminal's design.
The public source identifies “Marina Bay Cruise Centre Singapore” as cruise terminal in Singapore. This brief keeps that definition visible, then builds a research path around Marina, Cruise and Centre.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Marina Bay Cruise Centre Singapore”, the useful work is to connect “cruise terminal in Singapore” to the records capable of establishing context and consequence.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 2, 2026. The linked authority identifier is Q6763789. VIAF identifies the subject as 9452163159943301640003. Authority coordinates are 1.271, 103.862. 3 of 4 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2009 and 2012.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Marina Bay Cruise Centre Singapore”, its source revision and the description used here.
- Expand the search: follow Marina Bay Cruise Centre Singapore primary sources, Marina Bay Cruise Centre Singapore archive and Marina research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Marina Bay Cruise Centre Singapore”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Marina Bay Cruise Centre Singapore” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.