HMAS Leeuwin (A 245)
1997 Leeuwin-class survey vessel

HMAS Leeuwin (HS 01/A 245) is the lead ship of the Leeuwin-class of hydrographic survey vessels operated by the Royal Australian Navy (RAN).
Design and construction
Leeuwin has a displacement of 2,170 tons at full load. She is 71.2 metres (234 ft) long, with a beam of 15.2 metres (50 ft), and a draught of 4.3 metres (14 ft). Main propulsion machinery consists of four GEC Alsthom 6RK 215 diesel generators, which supply two Alsthom electric motors, each driving a propeller shaft. A Schottel bow thruster is fitted for additional manoeuvrability. Maximum speed is 13 knots (24 km/h; 15 mph), with a range of 18,000 nautical miles (33,000 km; 21,000 mi) at 9 knots (17 km/h; 10 mph).
The sensor suite consists of a STN Atlas 9600 APRA I-band navigational radar, a C-Tech CMAS 36/39 hull-mounted sonar, an Atlas Fansweep-20 multibeam echo sounder, an Atlas Hydrographic Deso single-beam echo sounder, and a Klein 2000 towed sonar. The sonars and echo sounders allow the vessels to chart waters up to 6,000 metres (20,000 ft) deep. There are three sets of davits fitted to carry Fantome-class survey boats. The ship is fitted with a helicopter deck, previously for an AS 350B Squirrel helicopter detached from 723 Squadron, although there are no long-term hosting facilities.
This brief starts where responsible research should: with the source description of “HMAS Leeuwin (A 245)” as 1997 Leeuwin-class survey vessel. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as 1997 Leeuwin-class survey vessel. Its deeper value depends on whether names, dates, institutions and citations support that framing.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Sep 21, 2026. The linked authority identifier is Q5630435. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2000.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “HMAS Leeuwin (A 245)”, its source revision and the description used here.
- Expand the search: follow HMAS Leeuwin (A 245) primary sources, HMAS Leeuwin (A 245) archive and HMAS research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “HMAS Leeuwin (A 245)”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “HMAS Leeuwin (A 245)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.