HidroAysén (Pronounced: EE-droh EYE-sen ) was a controversial megaproject that aimed to build five hydroelectric power plants in Chile's Aysén Region, two on the Baker River and three on the Pascua River (with government subvention included to help relief costs). Planned for construction during the 2010s, the project was definitely cancelled by its contractors in November 2017.
The total expected installed power was 2,750 MW, generating an average 18,430 gigawatt-hours (66,300 TJ) per year, which corresponds to 21% of Central Interconnected System's (SIC) demand by 2020. A 3,000 high-voltage direct current line would have been built between Aysén and the capital Santiago to feed the SIC, including a submarine portion between Chaitén and Puerto Montt. The projected cost was estimated at 3.2 billion U.S. dollars (1.5 trillion Chilean pesos), and would have employed 5,000 workers from Chile and abroad, making it the largest energy project in the country's history.
HidroAysén is owned by a corporation which is a joint venture between Endesa (a subsidiary of Italian conglomerate ENEL), with a 51% stake and by Colbún S.A. which owns the other 49%.
History
The dams were approved on May 9, 2011, under the government of President Sebastián Piñera. The decision was made by eleven counselors on a committee. Ten voted in favor, with one abstention. Twenty-seven days earlier the Foreign Investment Committee was already aware of the decision ahead of time.
The public source identifies “HidroAysén” as hydroelectric project in Chile. This brief keeps that definition visible, then builds a research path around HidroAysén, hydroelectric and project.
Why this record matters
A short description can identify a subject without explaining its stakes. For “HidroAysén”, the useful work is to connect “hydroelectric project in Chile” to the records capable of establishing context and consequence.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Aug 9, 2026. The linked authority identifier is Q3785491. Authority coordinates are -45.567, -72.067. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2017, 2020 and 2011.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “HidroAysén”, its source revision and the description used here.
- Expand the search: follow HidroAysén primary sources, HidroAysén archive and HidroAysén research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “HidroAysén”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “HidroAysén” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.