Horadiz–Jabrayil–Zangilan–Aghband Highway
highway under construction in Azerbaijan

Horadiz–Jabrayil–Zangilan–Aghband highway (Azerbaijani: Horadiz–Cəbrayıl–Zəngilan–Ağbənd avtomobil yolu) is a highway under construction in Azerbaijan. It runs through territories regained by Azerbaijan and forms part of the transport corridor associated with the Zangezur corridor concept.
As of September 2025, the road was reported as 95% complete, with completion planned for the second half of 2026.
History
The foundation ceremony for the highway took place on 26 October 2021, attended by the presidents of Azerbaijan and Turkey.
In September 2025, State Agency of Azerbaijan Automobile Roads reported that construction was 95% complete. A November 2025 report said the highway was expected to be completed in the second half of 2026.
Route and structure
The highway has a total length of 149.9 km, including a 123.6 km mainline section. It is being built to technical category I. According to official reporting, 78.5 km of the route is designed with six lanes and 45.1 km with four lanes.
The project includes tunnels, bridges, underpasses and other engineering structures along the route. Three tunnels are being built; excavation work in the tunnels was reported as complete by November 2025.
The public source identifies “Horadiz–Jabrayil–Zangilan–Aghband Highway” as highway under construction in Azerbaijan. This brief keeps that definition visible, then builds a research path around Horadiz, Jabrayil and Zangilan.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Horadiz–Jabrayil–Zangilan–Aghband Highway”, the useful work is to connect “highway under construction in Azerbaijan” to the records capable of establishing context and consequence.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Mar 13, 2026. The linked authority identifier is Q137270761. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2025, 2026 and 2021.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Horadiz–Jabrayil–Zangilan–Aghband Highway”, its source revision and the description used here.
- Expand the search: follow Horadiz–Jabrayil–Zangilan–Aghband Highway primary sources, Horadiz–Jabrayil–Zangilan–Aghband Highway archive and Horadiz research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Horadiz–Jabrayil–Zangilan–Aghband Highway”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Horadiz–Jabrayil–Zangilan–Aghband Highway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.