Hami–Lop Nur railway
railway line in People's Republic of China

Hami–Lop Nur railway or Haluo railway (simplified Chinese: 哈罗铁路; traditional Chinese: 哈羅鐵路; pinyin: hāluó tiělù), is a railway in the eastern part of the Xinjiang Uyghur Autonomous Region of China between Hami and Lop Nur. The line is 374.83 km (233 mi) long and began commercial operation on November 29, 2012. Construction began in August 2010 and track laying was completed in late July 2012. The Lop Nur terminal of the line is near the industrial facility at 40.463608°N 90.864700°E / 40.463608; 90.864700.
The line is mainly used to ship potassium salts mined near Lop Nur.
To ensure the supply of daily necessities for the staff along the line, commuter trains are officially launched from November 21, 2013, and commuter cars open every five days.
The public source identifies “Hami–Lop Nur railway” as railway line in People's Republic of China. This brief keeps that definition visible, then builds a research path around Hami, railway and line.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Hami–Lop Nur railway”, the useful work is to connect “railway line in People's Republic of China” to the records capable of establishing context and consequence.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Jul 30, 2025. The linked authority identifier is Q10922205. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2012, 2010 and 2013.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Hami–Lop Nur railway”, its source revision and the description used here.
- Expand the search: follow Hami–Lop Nur railway primary sources, Hami–Lop Nur railway archive and Hami research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Hami–Lop Nur railway”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Hami–Lop Nur railway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.