HSC Tiger
catamaran ferry built in 1993

HSC Tiger is a 74m fast catamaran ferry last operated by Hanil Express. She was built in 1992 by Incat, Hobart, Australia, as Condor 10 for Condor Ferries and first entered service in 1993. She has also served under the names Hanil Blue Narae and Jaguar.
Concept and construction
In 1989, Condor Ferries announced plans for a £5 million 450 passenger catamaran to be delivered in April 1990. This was to be the largest catamaran of its type in the world, and would be known as Condor 9. Although delivery of Condor 9 was delayed until July 1990, this did not prevent Condor from announcing their intention to enter the car carrying ferry business with an order for a new large catamaran for the 1992 season.
The £40 million contract for the new Condor vessel had been due for signing in September 1990, but after Condor 9 had to be withdrawn only four days after entering service due to sea keeping problems and similar problems being experienced by Hoverspeed Great Britain, Condor opted to delay the order until the issues with Condor 9 had been resolved. The acquisition of a 50% share in Condor Ferries by the Australian logistics and transport company, TNT in 1992 saw the announcement of two new Condor 74 metre car carrying catamarans (one leased) constructed by Incat in Tasmania. An 87 metre craft was to follow in 1996.
Service
1993–1994: Condor Ferries
In the event only one of the three announced vessels joined the fleet, and Condor 10 entered service with Condor Ferries between Weymouth and the Channel Islands in April 1993 replacing the smaller passenger only Condor 9.
“HSC Tiger” enters the record as catamaran ferry built in 1993. Crown Archives preserves that source wording while asking what Tiger, catamaran and ferry can confirm, complicate or overturn.
Why this record matters
“HSC Tiger” is worth following because a concise public description often conceals a longer documentary argument. Here, Tiger, catamaran and ferry provides the most credible route into that argument.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 4, 2026. The linked authority identifier is Q2662468. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1992, 1993, 1989 and 1990.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “HSC Tiger”, its source revision and the description used here.
- Expand the search: follow HSC Tiger primary sources, HSC Tiger archive and Tiger research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “HSC Tiger”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “HSC Tiger” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.