CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

MPR/DPR/DPD building

Seat of People's Consultative Assembly

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionJul 12, 2026
Entity authorityQ5205958
Source-derived summary

The Parliamentary Complex of Indonesia (Indonesian: Kompleks Parlemen Republik Indonesia), also known as the MPR/DPR/DPD Building, is the seat of government for the Indonesian legislative branch of government, which consists of the People's Consultative Assembly (MPR), the House of Representatives (DPR) and the Regional Representative Council (DPD).

History

Construction

Sukarno administration

Construction of the building was ordered on March 8, 1965, by Sukarno, the first president of Indonesia, through the Presidential Decree of the Republic of Indonesia Number 48 of 1965. The building was intended to house the Conference of the New Emerging Forces (CONEFO), a now defunct alternative for the United Nations, with the first conference being scheduled to be held in 1966. The members of the organization were planned to consist of the countries of Asia, Africa, Latin America, and the Non-Aligned Movement.

The first conference was scheduled to be held in 1966, and the building was scheduled for completion before August 17, 1966 — leaving 17 months left for the construction to take place. Construction began in March 1965 following a contest for the design, which resulted in the design by architect Soejoedi Wirjoatmodjo being agreed upon and ratified by President Sukarno on February 22, 1965.

Suharto administration

Construction was hampered due to the coup attempt on September 30, 1965. The CONEFO idea was soon abandoned after Sukarno's fall, but the building's construction was resumed based on the Decree of the Presidium of the Ampera Cabinet Number 79/U/Kep/11/1966 dated November 9, 1966, whose designation was changed for the MPR/DPR RI Building.

Gradually, construction was completed and handed over to the Secretariat General of the DPR: Main Conference Building (March 1968), Secretariat Building and Health Center Building (March 1978), Auditorium Building (September 1982), and Banquet Building (February 1983).

May 1998

In May 1998, the buildings were occupied by about 80,000 tertiary students protesting against the Trisakti shootings and the continuation of Suharto's New Order regime, which also calling for the dissolution of the People's Representative Council and People's Consultative Assembly of the 1998–2003 period.

Editorial summary

This brief starts where responsible research should: with the source description of “MPR/DPR/DPD building” as seat of People's Consultative Assembly. Everything that follows is an evidence route, not borrowed authority.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current lead gives the account dated anchors—1965, 1966, 1968, 1978—that can be checked directly. The linked authority record independently contributes the date 1983-02. The account is most persuasive where building, Seat and People's can be independently traced.
Editorial analysis

Why this record matters

The subject matters to the general reference register because the source frames it as seat of People's Consultative Assembly. Its deeper value depends on whether names, dates, institutions and citations support that framing.

Evidence profile

Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Jul 12, 2026. The linked authority identifier is Q5205958. Authority coordinates are -6.210, 106.800. 1 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1965, 1966, 1968 and 1978.

Critical limits

The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “MPR/DPR/DPD building”, its source revision and the description used here.
  2. Expand the search: follow MPR/DPR/DPD building primary sources, MPR/DPR/DPD building archive and building research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “MPR/DPR/DPD building”?
  2. What terminology or title could unlock a more precise catalogue search?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from MPR/DPR/DPD building” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.