GE BWR
Type of commercial fission reactor

General Electric's BWR product line of boiling water reactors represents the designs of a relatively large (~18%) percentage of the commercial fission reactors around the world.
The progenitor of the BWR line was the 5 MW Vallecitos Boiling Water Reactor (VBWR), brought online in October 1957. Six design iterations, BWR-1 through BWR-6, were introduced between 1955 and 1972.
This was followed by the Advanced Boiling Water Reactor (ABWR) introduced in the 1990s and the Economic Simplified Boiling Water Reactor (ESBWR) introduced in the early 2010s.
As of August 2018, 83 reactors of this design family have been built, of which 67 reactors are operational.
The design garnered world attention in the aftermath of the INES level 7 Fukushima Daiichi nuclear disaster of 11 March 2011. GE had been a major contractor to the Fukushima Daiichi Nuclear Power Plant in Japan, which consisted of six boiling water reactors of GE design. The reactors for Units 1, 2, and 6 were supplied by General Electric, the other three by Toshiba and Hitachi. Unit 1 was a 460 MW boiling water reactor from the BWR-3 design iteration introduced in 1965 and constructed in July 1967.
After the plant became severely damaged in the Tōhoku earthquake and tsunami, loss of reactor core cooling led to three nuclear meltdowns, three hydrogen explosions, and the release of radioactive contamination in Units 1, 2 and 3 between 12 and 15 March.
Begin with the source’s own compact description: “GE BWR” is type of commercial fission reactor. The dossier treats that line as a proposition to test through Type, commercial and fission, not as a finished interpretation.
Why this record matters
The phrase “type of commercial fission reactor” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jul 23, 2026. The linked authority identifier is Q16981717. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1957, 1955, 1972 and 2018.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “GE BWR”, its source revision and the description used here.
- Expand the search: follow GE BWR primary sources, GE BWR archive and Type research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “GE BWR”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “GE BWR” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.