GE C30-7
American diesel-electric locomotive class

The C30-7 is a six-axle diesel-electric locomotive built by GE Transportation Systems between September 1976 and May 1986. It was developed as an updated version of the U30C and is powered by a 16-cylinder GE FDL-series diesel engine rated at 3,000 horsepower (2,200 kW). A total of 1,137 units were built for North American railroads.
GE's successor to the C30-7 was the C36-7, and early C36-7 units were closely similar in appearance and design to the C30-7.
Variants
C30-7A
A variant of the C30-7, 50 GE C30-7As were purchased by Conrail in mid-1984. Externally similar to the GE C30-7 model, six tall hood doors per side (in place of eight) showed it had a 12-cylinder (rather than 16-cylinder) prime mover. Both engines produced 3,000 horsepower (2,200 kW) but the C30-7A's smaller engine used less fuel. The C30-7A units were built between May and June 1984.
Chicago Freight Car Leasing Australia purchased twelve former Conrail C30-7A locomotives in 2001 and used their traction components in the rebuilding of 442 class locomotives as the GL class. These entered service in Australia from 2003.
This brief starts where responsible research should: with the source description of “GE C30-7” as american diesel-electric locomotive class. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as american diesel-electric locomotive class. Its deeper value depends on whether names, dates, institutions and citations support that framing.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 23, 2026. The linked authority identifier is Q1485268. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1976, 1986, 1984 and 2001.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “GE C30-7”, its source revision and the description used here.
- Expand the search: follow GE C30-7 primary sources, GE C30-7 archive and C30-7 research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “GE C30-7”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “GE C30-7” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.