CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

Great Sea Interconnector

planned interconnector to link Greek, Cypriot and Israeli power grids via the world's longest submarine power cable

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionSep 6, 2026
Entity authorityQ5411505
Source-derived summary

The Great Sea Interconnector (GSI), formerly known as the EuroAsia Interconnector is a planned HVDC interconnector between the Greek, Cypriot, and Israeli power grids via the world's longest submarine power cable, with a length of 310 kilometres (190 mi) from Israel to Cyprus and 898 kilometres (558 mi) from Cyprus to Greece for a total of 1,208 kilometres (751 mi).

Connecting Kofinou, Cyprus to Hadera, Israel and Korakias, Crete, Greece, the EuroAsia Interconnector is a major Project of Common Interest (PCI) of the European Union and a priority Electricity Highway Interconnector Project as an energy highway bridging Asia and Europe.

On 12 May 2017, the Greek Prime Minister Alexis Tsipras met the State Grid Corporation of China Chairman Shu Yinbiao in Beijing, and CEO of EuroAsia Interconnector Nasos Ktorides supported the timely implementation of the EuroAsia Interconnector. On 12 December 2017 transmission system operator Elia announced the conclusion of a strategic alliance agreement for the development and implementation of the 2,000 MW interconnector.

On 8 March 2021, Cyprus, Greece and Israel signed an initial agreement to build the world's largest and deepest submarine power cable that will connect the three Mediterranean countries' power grids.

President of the European Commission Ursula von der Leyen visited Cyprus on 8 July 2021 and officially presented EU approval for the Cyprus plan to spend €1.2 billion under the EU Recovery and Resilience Plan.

EuroAsia Interconnector got €100 million funding from EU Recovery and Resilience Plan.

On 26 January 2022, the European Commission approved €657 million under the Connecting Europe Facility (CEF) for EuroAsia Interconnector.

The inauguration ceremony on the start of the construction works were held on 14 October 2022, at the Presidential Palace in Nicosia.

News about the suspension of the project rose in March 2025 following Turkey's objections.

Editorial summary

The public source identifies “Great Sea Interconnector” as planned interconnector to link Greek, Cypriot and Israeli power grids via the world's longest submarine power cable. This brief keeps that definition visible, then builds a research path around Great, Interconnector and planned.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current lead gives the account dated anchors—2017, 2021, 2022, 2025—that can be checked directly. The linked authority record independently contributes the date 2010. Its value is orientation rather than verdict, with Great, Interconnector and planned providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Great Sea Interconnector”, the useful work is to connect “planned interconnector to link Greek, Cypriot and Israeli power grids via the world's longest submarine power cable” to the records capable of establishing context and consequence.

Evidence profile

Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Sep 6, 2026. The linked authority identifier is Q5411505. 2 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2017, 2021, 2022 and 2025.

Critical limits

Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Great Sea Interconnector”, its source revision and the description used here.
  2. Expand the search: follow Great Sea Interconnector primary sources, Great Sea Interconnector archive and Great research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Great Sea Interconnector”?
  2. Which institution is responsible for the underlying evidence?
  3. What terminology or title could unlock a more precise catalogue search?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Great Sea Interconnector” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.