The Emu Downs Wind Farm (30°30′S 115°20′E) is a 79.2 MW wind farm in Western Australia. It was a 50:50 joint development between Griffin Energy and Stanwell Corporation. The site is approximately 200 kilometres north of Perth, near Cervantes. Construction of the $180 million project commenced in November 2005, and the project was commissioned in October 2006.
Emu Downs consists of 48 Vestas wind turbines (each with 1.65 MW generating capacity), a substation, interconnection to the main 132 kV electricity grid, administration and stores buildings, and a network of access roads. The wind farm is close to the coast, with a good quality wind resource that has increased wind speeds and reliability aligning with periods for peak power demand. The prevailing wind blows from the east in the mornings and the Fremantle Doctor from the west in the afternoons.
The wind farm provides electricity to the grid. 260 km (160 mi) to the south there is the Perth Seawater Desalination Plant, and turns water from the Indian Ocean into nearly 152 million litres (40 million gallons) of drinking water per day.
Emu Downs is accredited under the Australian Government's Renewable Energy (Electricity) Act 2000 and as a Green Power Generator by the Sustainable Energy Development Authority.
Begin with the source’s own compact description: “Emu Downs Wind Farm” is wind farm in Western Australia. The dossier treats that line as a proposition to test through Downs, Wind and Farm, not as a finished interpretation.
Why this record matters
The phrase “wind farm in Western Australia” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Feb 22, 2026. The linked authority identifier is Q5374851. Authority coordinates are -30.500, 115.333. 2 of 2 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank. The first chronological checks are 2005, 2006 and 2000.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Emu Downs Wind Farm”, its source revision and the description used here.
- Expand the search: follow Emu Downs Wind Farm primary sources, Emu Downs Wind Farm archive and Downs research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Emu Downs Wind Farm”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Emu Downs Wind Farm” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.