CACrown ArchivesThe cinema collection
Menu
Research dossier · Places & Architecture

BC Electric Building

building in British Columbia, Canada

Architectural plans, a scale model, maps and brass measuring instruments
Places and architectureInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionJul 8, 2026
Entity authorityQ5357233 ↗
Source-derived summary

The BC Electric Building is a 22-storey office tower in Vancouver, British Columbia. The building was constructed as the headquarters of the BC Electric Company and was designed by Thompson Berwick & Pratt. The project's design architect was Ron Thom. In 1995, the building was converted from offices to residences and renamed the Electra.

History

The structure was built by John Laing & Sons in 1957 as the new headquarters for the BC Electric Company, under its president Dal Grauer. A few days after Grauer's death in 1961, it became part of a new provincial crown corporation named BC Hydro. The 22-storey, 89-metre (292 ft) building's commission was arranged by Charles Edward "Ned" Pratt.

At the time, it was claimed to be the tallest office building in the Commonwealth, although this was not true. After BC Hydro moved to new offices in Vancouver and Burnaby in the late 1990s, the building was sold, and in 1998, was renovated and converted primarily into residential condo space, although BC Hydro continues to operate the Dal Grauer Substation, whose space is integral with Electra.

While BC Electric's offices were in the building, ten large air horns on top of the structure played the first four notes of O Canada at noon every day.

Editorial summary

The public source identifies “BC Electric Building” as building in British Columbia, Canada. This brief keeps that definition visible, then builds a research path around Electric, Building and building.

Editorial reviewA strong orientation record where physical form, institutional use and historical geography need to be read together. The current lead gives the account dated anchors—1995, 1957, 1961, 1998—that can be checked directly. The linked authority record independently contributes the date 1957. Its value is orientation rather than verdict, with Electric, Building and building providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “BC Electric Building”, the useful work is to connect “building in British Columbia, Canada” to the records capable of establishing context and consequence.

Evidence profile

Maps, plans, fabric surveys and administrative records can establish how the site’s name, extent and function changed over time. The source revision retrieved here is dated Jul 8, 2026. The linked authority identifier is Q5357233. Authority coordinates are 49.281, -123.125. 2 of 2 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank. The first chronological checks are 1995, 1957, 1961 and 1998.

Critical limits

A single description cannot reconcile every naming convention, rebuilding phase or administrative transfer associated with a place. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.

Best used for
  • Historic place names
  • Jurisdictional context
  • Routes into maps and plans
Verify next

Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.

Three-step research path

  1. Establish the record: confirm the title “BC Electric Building”, its source revision and the description used here.
  2. Expand the search: follow BC Electric Building primary sources, BC Electric Building archive and Electric research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “BC Electric Building”?
  2. Which earlier names or jurisdictions may reveal additional records?
  3. What physical evidence or contemporary plan supports the description?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “BC Electric Building” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.