CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

New Administrative Capital Stadium

Football Stadium in Egypt

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionSep 18, 2026
Entity authorityQ110888393
Source-derived summary

Misr Stadium (Egyptian Arabic: ستاد مصر, translit: Egypt Stadium), also known as the New Capital Stadium, is a stadium in Egypt's Olympic Sports City in the New Capital. It has a capacity of over 93,940 people, making it the largest stadium in the country and the second largest in Africa.

It is part of the Egypt International Olympic City, a large sports complex that has been under construction since 2015. It will have a training ground, two indoor halls (one of them a 15,000-capacity arena), an Olympic-size swimming pool, and other buildings, and is being built with an eye toward the country's possible bids for the Olympic Games or the FIFA World Cup.

History

Construction of the stadium began in 2019 as part of a large Olympic sports complex. It was designed by Italian firms SHESA Architects and MJW Structures with partnership with Cosmos-E engineers and consultants, who had also worked on Juventus Stadium in Turin and the Paul Biya stadium in Yaoundè, Cameroon. Orascom Construction were the main contractor, Design Review and Construction

Supervision by ACE Consulting Engineers (Moharram and Bakhoum), Owner and Project Management EAAF.

The stadium was completed in late 2023, and hosted the Egypt national football team training camp before the 2023 Africa Cup of Nations. It was inaugurated on 22 March 2024, when Egypt hosted New Zealand in a friendly match, beating them 1–0.

Design

The Misr Stadium is built on an elliptical ground plan. The roof is stylistically based on the headdress and the royal necklace of Nefertiti, the ancient Egyptian queen.

Editorial summary

Begin with the source’s own compact description: “New Administrative Capital Stadium” is football Stadium in Egypt. The dossier treats that line as a proposition to test through Administrative, Capital and Stadium, not as a finished interpretation.

Editorial reviewA concise reference frame for defining the subject, testing terminology and identifying the institution closest to the evidence. The current lead gives the account dated anchors—2015, 2019, 2023, 2024—that can be checked directly. The linked authority record independently contributes the date 2024-01. For this dossier, Administrative, Capital and Stadium is the immediate research focus.
Editorial analysis

Why this record matters

The phrase “football Stadium in Egypt” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.

Evidence profile

Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 18, 2026. The linked authority identifier is Q110888393. Authority coordinates are 29.892, 31.672. None of the 2 selected statements returned an explicit reference. The first chronological checks are 2015, 2019, 2023 and 2024.

Critical limits

A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “New Administrative Capital Stadium”, its source revision and the description used here.
  2. Expand the search: follow New Administrative Capital Stadium primary sources, New Administrative Capital Stadium archive and Administrative research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “New Administrative Capital Stadium”?
  2. What terminology or title could unlock a more precise catalogue search?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from New Administrative Capital Stadium” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.