CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

East–West Interconnector

subsea high-voltage direct current electricity cable transmission line between the United Kingdom and Ireland

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionSep 6, 2026
Entity authorityQ5331045 ↗
Source-derived summary

The East–West Interconnector is a 500 MW high-voltage direct current submarine and subsoil power cable from 2012 which connects the Irish and British electricity markets, between Dublin and the Wales/England border. The project was developed by the Irish national grid operator EirGrid.

Aim

The interconnector is aimed to increase competition and security of supply, and better use the capacity of wind energy. The additional capacity headroom provided by the interconnection will assist in reducing the Electricity Supply Board's dominant position in the Irish electricity market. By joining the two markets it will allow Irish suppliers to access power in the British mainland market and for British suppliers to enter the Irish market without initially having to commit to large capital expenditure, significantly reducing barriers to entry. Irish renewable generators will benefit from the interconnection as it will increase their available market and may make it more economically attractive to construct more large scale renewable generation.

ESB Power Generation announced in 2007 its intention to withdraw approximately 1,300 MW of capacity by 2010. This would effectively reduce the installed capacity of fully dispatchable plant from 6,437 MW to 5,150 MW. This closure of older inefficient power plants, such as a 461 MW fossil fuel capacity at Poolbeg Generating Station Dublin, and coupled with the high growth demand forecasts presented, created a major threat to the security of the Irish electricity grid.

The interconnection will enhance security of supply and grid stability on both countries and create conditions suitable for the development of a new regional market. The European Commission expressed the view that European electricity markets would benefit from further interconnection investments.

Editorial summary

Begin with the source’s own compact description: “East–West Interconnector” is subsea high-voltage direct current electricity cable transmission line between the United Kingdom and Ireland. The dossier treats that line as a proposition to test through East, West and Interconnector, not as a finished interpretation.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current lead gives the account dated anchors—2012, 2007, 2010—that can be checked directly. The selected authority fields contribute no independent date. For this dossier, East, West and Interconnector is the immediate research focus.
Editorial analysis

Why this record matters

The phrase “subsea high-voltage direct current electricity cable transmission line between the United Kingdom and Ireland” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.

Evidence profile

Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Sep 6, 2026. The linked authority identifier is Q5331045. Authority coordinates are 53.531, -4.826. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2012, 2007 and 2010.

Critical limits

The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “East–West Interconnector”, its source revision and the description used here.
  2. Expand the search: follow East–West Interconnector primary sources, East–West Interconnector archive and East research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “East–West Interconnector”?
  2. What terminology or title could unlock a more precise catalogue search?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “East–West Interconnector” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.