Dongara–Eneabba railway line
railway line in Western Australia

The Dongara–Eneabba railway line is a disused railway line in the Mid West region of Western Australia. It branches off the Midland railway line at Dongara and runs for 94 kilometres (58 mi) to Eneabba. It opened in 1976 and closed in 2013, and was solely used to haul mineral sands from a mine at Eneabba to Geraldton Port.
Description
The Dongara–Eneabba railway line was constructed with a 1,067 mm (3 ft 6 in) track gauge, conforming with Western Australia's narrow gauge network. The ruling gradient is 1 in 200 and the rail weight is 40 kilograms per metre (81 lb/yd). The line is 94 kilometres (58 mi) long. The town of Eneabba is at the 80-kilometre (50 mi) mark and the town of Arrowsmith is at the 42-kilometre (26 mi) mark. The alignment roughly parallels Brand Highway. Half the route travels through privately held farmland and half travels through crown land. The line crosses the Irwin River and the Arrowsmith River.
The public source identifies “Dongara–Eneabba railway line” as railway line in Western Australia. This brief keeps that definition visible, then builds a research path around Dongara, Eneabba and railway.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Dongara–Eneabba railway line”, the useful work is to connect “railway line in Western Australia” to the records capable of establishing context and consequence.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Aug 3, 2026. The linked authority identifier is Q128031759. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1976 and 2013.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Dongara–Eneabba railway line”, its source revision and the description used here.
- Expand the search: follow Dongara–Eneabba railway line primary sources, Dongara–Eneabba railway line archive and Dongara research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Dongara–Eneabba railway line”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Dongara–Eneabba railway line” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.