Design–build (or design/build or design and build, and abbreviated D–B, D/B or D&B accordingly), also known as alternative delivery, is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor. It can be subdivided into architect-led design–build (ALDB, sometimes known as designer-led design–build) and contractor-led design–build.

In contrast to "design–bid–build" (or "design–tender"), design–build relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.

Design–build also has a single point responsibility. The design-build contractor is responsible for all work on the project, so the client can seek legal remedies for any fault from one party.

The traditional approach for construction projects consists of the appointment of a designer on one side, and the appointment of a contractor on the other side. The design–build procurement route changes the traditional sequence of work. It answers the client's wishes for a single point of responsibility in an attempt to reduce risks and overall costs. Although the use of subcontractors to complete more specialized work is common, the design-build contractor remains the primary contact and primary force behind the work.

Editorial summary

“Design–build” enters the record as construction project delivery system. Crown Archives preserves that source wording while asking what Design, build and construction can confirm, complicate or overturn.

Editorial reviewA practical starting point whose main value is the path it opens into stronger specialist and primary sources. The current 227-word lead offers orientation but no explicit four-digit date, so chronology should not be assumed. The selected authority fields contribute no independent date. Its strongest next move is a source search built around Design, build and construction.
Editorial analysis

Why this record matters

“Design–build” is worth following because a concise public description often conceals a longer documentary argument. Here, Design, build and construction provides the most credible route into that argument.

Evidence profile

The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 11, 2026. The linked authority identifier is Q4921794. None of the 0 selected statements returned an explicit reference.

Critical limits

The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Design–build”, its source revision and the description used here.
  2. Expand the search: follow Design–build primary sources, Design–build archive and Design research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Design–build”?
  2. Which institution is responsible for the underlying evidence?
  3. What terminology or title could unlock a more precise catalogue search?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Design–build” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.