Pandoh Dam
dam in Himachal Pradesh, India

The Pandoh Dam is an embankment dam on the Beas River in Mandi district of Himachal Pradesh, India. Under the Beas Project, the dam was completed in 1977 and its primary purpose is hydroelectric power generation. Part of a run-of-the-river power scheme, it diverts the waters of the Beas to the southwest through a 38 km (24 mi) long system of tunnels and channels. The water is used for power generation at the Dehar Power House before being discharged into the Sutlej River, connecting both rivers. The power house has an installed capacity of 990 MW. The system diverts 256 cumecs (9000 cusecs) of Beas waters to the Satluj River. The project was completed in 1977.
History
The two major rivers Beas and Satlej flow out of the himalayas and reach a point where they are separated by a crow fly distance of approximately 36 km and have an elevation difference of approximately 1099 ft. The waters of Beas flow from melting ice throughout the year. This was realized and a plan made to exploit the potential of this river system. The power potential was estimated as 1,000 MW. The plans originally called Beas Project Unit - I Beas Satluj Link Project went through several revisions for diverting the waters of Beas river.
The public source identifies “Pandoh Dam” as dam in Himachal Pradesh, India. This brief keeps that definition visible, then builds a research path around Pandoh, Himachal and Pradesh.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Pandoh Dam”, the useful work is to connect “dam in Himachal Pradesh, India” to the records capable of establishing context and consequence.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Sep 16, 2026. The linked authority identifier is Q7130687. Authority coordinates are 31.671, 77.067. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1977 and 1099.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Pandoh Dam”, its source revision and the description used here.
- Expand the search: follow Pandoh Dam primary sources, Pandoh Dam archive and Pandoh research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Pandoh Dam”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Pandoh Dam” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.