Cost estimate
type of estimate

A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values.
The U.S. Government Accountability Office (GAO) defines a cost estimate as "the summation of individual cost elements, using established methods and valid data, to estimate the future costs of a program, based on what is known today".
The American Association of Cost Engineering (AACEI) defines a cost estimate as the prediction of the probable costs of a project or effort, for a given and documented scope, a defined location, and point of time in the future (February 2021).
Potential cost overruns can be avoided with a credible, reliable, and accurate cost estimate.
Overview
The GAO reports that "realistic cost estimating was imperative when making wise decisions in acquiring new systems". A cost estimate is often needed to support evaluations of project feasibility or funding requirements in support of planning. A cost estimate is often used to establish a budget as the cost constraint for a project or operation.
In project management, project cost management is a major functional division.
The public source identifies “Cost estimate” as type of estimate. This brief keeps that definition visible, then builds a research path around Cost, estimate and type.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Cost estimate”, the useful work is to connect “type of estimate” to the records capable of establishing context and consequence.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Sep 21, 2026. The linked authority identifier is Q795053. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2021.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Cost estimate”, its source revision and the description used here.
- Expand the search: follow Cost estimate primary sources, Cost estimate archive and Cost research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Cost estimate”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Cost estimate” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.