CACrown ArchivesThe cinema collection
Menu
Research dossier · Places & Architecture

Coober Pedy Solar Power Station

cancelled solar power station project

Architectural plans, a scale model, maps and brass measuring instruments
Places and architectureInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionJan 1, 2026
Entity authorityQ5166801 ↗
Source-derived summary

The Coober Pedy Solar Power Station was planned to be Australia's largest off-grid solar power station, located at remote Coober Pedy in South Australia's far north. The project would cost $7.1 million and the Australian Government promised providing $3.55 million under its Renewable Remote Power Generation program. When completed at the end of 2009, the power station was to consist of 26 solar dishes, each one 14 metres high, which would track the arc of the Sun. The power plant was to generate about 1860 megawatt-hours per year, 13 per cent of Coober Pedy's total electricity requirements. It would cut Diesel fuel consumption by up to 520,000 litres a year, saving 1,500 tonnes of greenhouse gas emissions.

In 2014, a new proposal was raised to create a hybrid solar, wind and Diesel power system for Coober Pedy. The contract was let to Energy Developments without an open tender process. The project will convert Coober Pedy's electricity from being generated 100% from Diesel to only 30% Diesel, with the other 70% provided by the combination of renewable energy sources. Energy Developments Limited is the developer for the new system. It has been supplying the electricity for Coober Pedy since 2004.

Editorial summary

The public source identifies “Coober Pedy Solar Power Station” as cancelled solar power station project. This brief keeps that definition visible, then builds a research path around Coober, Pedy and Solar.

Editorial reviewA valuable geographic starting point for tracing changing names, boundaries, uses and administrative responsibility. The current lead gives the account dated anchors—2009, 1860, 2014, 2004—that can be checked directly. The selected authority fields contribute no independent date. Its value is orientation rather than verdict, with Coober, Pedy and Solar providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “Coober Pedy Solar Power Station”, the useful work is to connect “cancelled solar power station project” to the records capable of establishing context and consequence.

Evidence profile

Maps, plans, fabric surveys and administrative records can establish how the site’s name, extent and function changed over time. The source revision retrieved here is dated Jan 1, 2026. The linked authority identifier is Q5166801. Authority coordinates are -29.029, 134.773. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2009, 1860, 2014 and 2004.

Critical limits

Modern boundaries and familiar names can conceal earlier jurisdictions or structures that do not align with the present site. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.

Best used for
  • Historic place names
  • Jurisdictional context
  • Routes into maps and plans
Verify next

Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.

Three-step research path

  1. Establish the record: confirm the title “Coober Pedy Solar Power Station”, its source revision and the description used here.
  2. Expand the search: follow Coober Pedy Solar Power Station primary sources, Coober Pedy Solar Power Station archive and Coober research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Coober Pedy Solar Power Station”?
  2. Which authority defined the place, boundary or structure at the relevant date?
  3. Which earlier names or jurisdictions may reveal additional records?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Coober Pedy Solar Power Station” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.