Connel Bridge
cantilever bridge in Argyll and Bute, Scotland, UK, carries the A828 road across Loch Etive

Connel Bridge is a cantilever bridge that spans Loch Etive at Connel in Scotland. The bridge takes the A828 road across the narrowest part of the loch, at the Falls of Lora. It is a category B listed structure.
History
The bridge was built by Arrol's Bridge and Roof Company to carry the Ballachulish branch line of the Callander and Oban Railway, which opened on 20 August 1903. Nearly 2,600 long tons (2,640 t; 2,910 short tons) of steel were used in its construction and it cost almost £43,000 to build. When complete it had a longer span than any other railway bridge in Britain except the Forth Bridge, built by a different firm. The Connel Bridge was constructed by a firm called Arrol, of the Germiston Iron Works, Glasgow It was engineered by John Wolfe Barry. The resident engineer responsible for the build was Edward Cruttwell.
Originally, the bridge carried just the railway (a single track). In 1909, however, an additional train service started running between Connel Ferry station and Benderloch on which road vehicles could be transported over the bridge.
The public source identifies “Connel Bridge” as cantilever bridge in Argyll and Bute, Scotland, UK, carries the A828 road across Loch Etive. This brief keeps that definition visible, then builds a research path around Connel, Bridge and cantilever.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Connel Bridge”, the useful work is to connect “cantilever bridge in Argyll and Bute, Scotland, UK, carries the A828 road across Loch Etive” to the records capable of establishing context and consequence.
The strongest evidence will usually combine a dated visual record with documents produced by the authority responsible for the place. The source revision retrieved here is dated Apr 17, 2026. The linked authority identifier is Q5161719. Authority coordinates are 56.456, -5.391. 2 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1903 and 1909.
A single description cannot reconcile every naming convention, rebuilding phase or administrative transfer associated with a place. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.
- Historic place names
- Jurisdictional context
- Routes into maps and plans
Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.
Three-step research path
- Establish the record: confirm the title “Connel Bridge”, its source revision and the description used here.
- Expand the search: follow Connel Bridge primary sources, Connel Bridge archive and Connel research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Connel Bridge”?
- What physical evidence or contemporary plan supports the description?
- Which earlier names or jurisdictions may reveal additional records?
Search terms from this dossier
This entry incorporates text from “Connel Bridge” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.