CACrown ArchivesThe cinema collection
Menu
Research dossier · General Reference

InterCity 225

High speed train in UK

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionAug 28, 2026
Entity authorityQ942987
Source-derived summary

The InterCity 225 is an electric push-pull high speed train in Great Britain, each originally comprising a Class 91 electric locomotive, nine Mark 4 coaches and a Driving Van Trailer (DVT). The Class 91 locomotives were built by British Rail Engineering Limited's Crewe Works as a spin-off from the Advanced Passenger Train (APT) project, which was abandoned during the 1980s, whilst the coaches and DVT were constructed by Metro-Cammell in Birmingham and Breda (under sub-contract) in Italy, again borrowing heavily from the APT. The trains were designed to operate at up to 140 mph (225 km/h) in regular service, but are limited to 125 mph (200 km/h) principally due to a lack of cab signalling and the limitations of the current overhead line equipment. They were introduced into service between 1989 and 1991 for inter-city services on the East Coast Main Line (ECML) from London King's Cross to Leeds, York and Edinburgh Waverley. In late 2025, the remaining sets in use were reduced to seven carriages in order that they could keep to the timings for LNER's new timetable.

History

Background

The origin of the InterCity 225 is closely associated with the ECML upon which it has been primarily operated. During the 1950s, British Rail had considered electrification of the ECML to be of equal importance to the West Coast Main Line (WCML), but various political factors led to the envisioned electrification programme being delayed for decades; as an alternative, high-speed diesel traction, including the Class 55 Deltics and InterCity 125, was introduced upon the route during the 1960s and 1970s. During the 1970s, a working group of British Rail and Department for Transport officials determined that, out of all options for further electrification, the ECML represented the best value by far. Its in-house forecasts determined that increases in revenue and considerable reductions in energy and maintenance costs would occur by electrifying the line.

Accordingly, between 1976 and 1991, the ECML was electrified with 25 kV AC overhead lines. The electrification was installed in two phases: The first phase between London King's Cross and Hitchin (including the Hertford Loop Line) was carried out between 1976 and 1978 as the Great Northern Suburban Electrification Project, using Mk.3A equipment, covering 30 miles in total.

Editorial summary

The public source identifies “InterCity 225” as high speed train in UK. This brief keeps that definition visible, then builds a research path around InterCity, High and speed.

Editorial reviewA concise reference frame for defining the subject, testing terminology and identifying the institution closest to the evidence. The current lead gives the account dated anchors—1989, 1991, 2025, 1976—that can be checked directly. The selected authority fields contribute no independent date. Its value is orientation rather than verdict, with InterCity, High and speed providing the first useful test.
Editorial analysis

Why this record matters

A short description can identify a subject without explaining its stakes. For “InterCity 225”, the useful work is to connect “high speed train in UK” to the records capable of establishing context and consequence.

Evidence profile

Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Aug 28, 2026. The linked authority identifier is Q942987. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1989, 1991, 2025 and 1976.

Critical limits

Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “InterCity 225”, its source revision and the description used here.
  2. Expand the search: follow InterCity 225 primary sources, InterCity 225 archive and InterCity research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “InterCity 225”?
  2. Which cited source is closest to the event, object or claim?
  3. Which institution is responsible for the underlying evidence?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from InterCity 225” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.