M3 (Copenhagen Metro)
Copenhagen Metro line

The M3 line or City Circle Line is a loop line of the Copenhagen Metro. It has been claimed by COWI that the line is the largest construction project to have taken place in Copenhagen during the last 400 years. The network's total length is 15.5 kilometres (9.6 mi) and has 17 stations. The line opened on 29 September 2019.
Plans for its construction were approved by the Danish Parliament on 1 June 2007. Preferred bidders were announced during November 2010. The total cost was estimated at 15 billion kroner but had risen to 21.3 billion kroner ($3.39 billion) when the contractors were announced in late 2010. It is a fully automated line, using driverless trains and capable of routine 24/7 operations. Italian rolling stock manufacturer AnsaldoBreda provides the trains for the new line, and the stations are intentionally similar to the Copenhagen Metro's existing stations. The transit agency Movia has projected that up to 34 million passengers eventually switch from buses to using the Metro during each year.
This brief starts where responsible research should: with the source description of “M3 (Copenhagen Metro)” as copenhagen Metro line. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as copenhagen Metro line. Its deeper value depends on whether names, dates, institutions and citations support that framing.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Aug 14, 2026. The linked authority identifier is Q1094251. Authority coordinates are 55.700, 12.550. 1 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2019, 2007 and 2010.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “M3 (Copenhagen Metro)”, its source revision and the description used here.
- Expand the search: follow M3 (Copenhagen Metro) primary sources, M3 (Copenhagen Metro) archive and Copenhagen research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “M3 (Copenhagen Metro)”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “M3 (Copenhagen Metro)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.