China Railways 6K
electric locomotive of China

The 6K is a Japanese-built electric locomotive used in China. It is developed and built by Kawasaki Heavy Industries and Mitsubishi Electric. The design of 6K is based on JNR Class ED75 and EF66 electric locomotives. It is the first locomotive with Bo-Bo-Bo wheel arrangement used in China.
Production
In total 85 6Ks were built between 1986 and 1987.
Equipment
Each 6K locomotive uses CLG-616 phase splitter and 6 Mitsubishi Electric MB-530-AVR DC traction motors.
Performance
6K was one of the most reliable electric locomotives in China compared with SS1, SS2 and SS3 at the time of entering service. China later made SS7 locomotive with reference to the Tri-Bo wheel arrangement of 6K, the breakdown rate, however, was still high, until its modified version SS7B, SS7C and SS7D designed.
Retirement
The mass retirement of the 6K fleet began in the second half of 2013 due to aging and reliability issues.
The final use of a 6K locomotive was on 21 March 2014 when the 6918/6919 passenger train from Jiafeng arrived at Luoyang station.
The public source identifies “China Railways 6K” as electric locomotive of China. This brief keeps that definition visible, then builds a research path around China, Railways and electric.
Why this record matters
A short description can identify a subject without explaining its stakes. For “China Railways 6K”, the useful work is to connect “electric locomotive of China” to the records capable of establishing context and consequence.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Aug 1, 2026. The linked authority identifier is Q744189. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1986, 1987, 2013 and 2014.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “China Railways 6K”, its source revision and the description used here.
- Expand the search: follow China Railways 6K primary sources, China Railways 6K archive and China research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “China Railways 6K”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “China Railways 6K” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.