Red Line (MBTA)
Rapid transit line in Greater Boston, Massachusetts

The Red Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south and east underground from Alewife station in North Cambridge through Somerville and Cambridge, surfacing to cross the Longfellow Bridge then returning to tunnels under Downtown Boston. It continues underground through South Boston, splitting into two branches on the surface at JFK/UMass station. The Ashmont branch runs southwest through Dorchester to Ashmont station, where the connecting light rail Mattapan Line (shown as part of the Red Line on maps, but operated separately) continues to Mattapan station. The Braintree branch runs southeast through Quincy and Braintree to Braintree station.
The Red Line operates during normal MBTA service hours (all times except late nights) with six-car trains. The 218-car active fleet consists of three orders of cars built in 1969–70, 1987–89, and 1993–94. A 252-car order from CRRC is being built from 2019 to 2027. The Red Line is fully grade-separated; trains are driven by operators with automatic train control for safety. Cabot Yard in South Boston is used for heavy maintenance and storage; yards at Alewife, Ashmont, and Braintree are also used for storage.
Begin with the source’s own compact description: “Red Line (MBTA)” is rapid transit line in Greater Boston, Massachusetts. The dossier treats that line as a proposition to test through Line, MBTA and Rapid, not as a finished interpretation.
Why this record matters
The phrase “rapid transit line in Greater Boston, Massachusetts” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 21, 2026. The linked authority identifier is Q152039. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1969, 1987, 1993 and 2019.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Red Line (MBTA)”, its source revision and the description used here.
- Expand the search: follow Red Line (MBTA) primary sources, Red Line (MBTA) archive and Line research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Red Line (MBTA)”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Red Line (MBTA)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.