USS United States (CVA-58)
cancelled United States-class supercarrier

USS United States (CVA-58) was to be the lead ship of a new design of aircraft carrier. On 29 July 1948, President Harry Truman approved construction of five flush deck "supercarriers", for which funds had been provided in the Naval Appropriations Act of 1949. The keel of the first of the five planned postwar carriers was laid down on 18 April 1949 at Newport News Drydock and Shipbuilding. The program was canceled in 1949, United States was not completed, and the other four planned carriers were never built.
Design
The chief proponent for the new large carrier was Admiral Marc Mitscher. He wanted a carrier that would be able to handle the most effective weapons of the day. Early design discussions centered around developing a carrier that would be able to support combat missions using the new jet aircraft. These were faster, larger and significantly heavier than the aircraft which the Essex- and Midway-class carriers were handling at the end of the Second World War. It was thought that the aircraft carried would have to have longer range to allow the carrier to operate farther away from the target. The deck would have to be able to handle the weight of the heavy jet aircraft landing on it.
This brief starts where responsible research should: with the source description of “USS United States (CVA-58)” as cancelled United States-class supercarrier. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as cancelled United States-class supercarrier. Its deeper value depends on whether names, dates, institutions and citations support that framing.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 6, 2026. The linked authority identifier is Q1499604. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1948 and 1949.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “USS United States (CVA-58)”, its source revision and the description used here.
- Expand the search: follow USS United States (CVA-58) primary sources, USS United States (CVA-58) archive and United research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “USS United States (CVA-58)”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “USS United States (CVA-58)” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.