Research dossier · Science & Nature

Busitema Solar Power Station

power plant in Uganda

Specimen drawers, botanical folios and brass scientific instruments under study light
Science and natureInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionFeb 17, 2024
Entity authorityQ56278464
Source-derived summary

The Busitema Solar Power Station is a 4 megawatts (5,400 hp) solar power plant in Uganda.

Location

The power station is located in Busia District in the Eastern Region of Uganda, on the main campus of Busitema University, a public university, approximately 183 kilometres (114 mi), by road, east of Kampala, the largest city and capital of Uganda.

Overview

This solar station is a donation from the government of Egypt to the government of Uganda. This followed the signing of bilateral agreements between the two countries in 2016. This was then followed by the signing of a memorandum of understanding between Abdel Fattah el-Sisi, the president of Egypt, and Yoweri Museveni, the president of Uganda, in May 2018. The power station is intended to increase Uganda's renewable energy pool, increase the supply of power to the Eastern Region, and serve as a teaching tool to university students studying renewable energy programs.

This power station was the fifth solar power station connected to the Ugandan national electricity power grid, after the Soroti Solar Power Station, which came online in December 2015, the Tororo Solar Power Station, which was commissioned in October 2017, and the Kabulasoke Solar Power Station, which was commissioned in December 2018. Mayuge Solar Power Station with capacity of 10 megawatts came online in June 2019.

Developers

The solar power plant was developed by engineers from the Egyptian Ministry of Electric & Renewable Energy Authority. The senior engineer is Mohammed A. Abdel Aziz and the project manager is engineer Reda Shaban Ali.

Editorial summary

Begin with the source’s own compact description: “Busitema Solar Power Station” is power plant in Uganda. The dossier treats that line as a proposition to test through Busitema, Solar and Power, not as a finished interpretation.

Editorial reviewUseful for establishing the present vocabulary of the subject while preserving a route back to the evidence on which that vocabulary rests. The current lead gives the account dated anchors—2016, 2018, 2015, 2017—that can be checked directly. The selected authority fields contribute no independent date. For this dossier, Busitema, Solar and Power is the immediate research focus.
Editorial analysis

Why this record matters

The phrase “power plant in Uganda” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.

Evidence profile

The date and method of observation matter as much as the stated conclusion, especially where classification or consensus has changed. The source revision retrieved here is dated Feb 17, 2024. The linked authority identifier is Q56278464. Authority coordinates are 0.547, 34.024. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2016, 2018, 2015 and 2017.

Critical limits

A general summary may omit uncertainty, sample limits or methodological disagreement that is explicit in the technical record. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Check terminology, classification and the date of the cited evidence. Scientific names and technical consensus can change while older records retain historical value.

Best used for
  • Current terminology
  • Classification context
  • Finding cited technical literature
Verify next

Primary datasets, specimen catalogues, standards bodies and the most recent peer-reviewed literature.

Three-step research path

  1. Establish the record: confirm the title “Busitema Solar Power Station”, its source revision and the description used here.
  2. Expand the search: follow Busitema Solar Power Station primary sources, Busitema Solar Power Station archive and Busitema research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Busitema Solar Power Station”?
  2. Which observation, specimen, dataset or publication supports the account?
  3. Is the terminology current, historical or disputed?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Busitema Solar Power Station” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.