Brussels tram route 3
tram route in Brussels

The premetro and tram route 3 in Brussels, Belgium, was operated by STIB/MIVB, and connected the Esplanade stop (on the borders of Neder-Over-Heembeek in Laeken in the City of Brussels and Strombeek-Bever) with the Churchill stop in the southern municipality of Uccle. The line was named after the planned Metro line 3, which is set to service most of the former route of tram line 3. The colour of the signage for this line was lime-green.
On 23 September 2024, the line was permanently discontinued, with most of its route being taken over by the new line 10. A further tram line 35 was established, taking over the Esplanade–Van Praet portion of line 3 and continuing on to a new terminus at Bienfaiteurs/Weldoeners.
Following its disbandment, only tram lines 4 and 10 remain in the North–South Axis that runs underneath the Pentagon (Brussels' city centre). Both lines 4 and 10 have a 6-minute schedule during rush hour and are serviced by the modern low-floor trams (Bombardier T3000 and T4000).
History
The line was created on 30 June 2008, replacing tram routes 55 and 56. Together with tram routes 4, 7, 8 and 9, it was one of five 'chrono' lines, which means that it was served by low-floor high-capacity trams with a high frequency. The low line number chosen for the new line shows that it is either a metro line or a 'chrono' line.
“Brussels tram route 3” enters the record as tram route in Brussels. Crown Archives preserves that source wording while asking what Brussels, tram and route can confirm, complicate or overturn.
Why this record matters
“Brussels tram route 3” is worth following because a concise public description often conceals a longer documentary argument. Here, Brussels, tram and route provides the most credible route into that argument.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Jan 19, 2026. The linked authority identifier is Q1888831. The first chronological checks are 2024 and 2008.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Brussels tram route 3”, its source revision and the description used here.
- Expand the search: follow Brussels tram route 3 primary sources, Brussels tram route 3 archive and Brussels research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Brussels tram route 3”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Brussels tram route 3” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.