Braemar Power Station
complex of combined cycle power stations in Queensland, Australia

Braemar Power Station is a complex of natural gas and coal seam gas fired combined-cycle power stations in Kogan, Western Downs Region, Queensland, Australia. It is near Dalby in the Darling Downs region.
Braemar-1
Braemar-1 is a 564 MW open-cycle natural gas turbine plant located 35 kilometres (22 mi) south west of Dalby, adjacent to the Kogan Creek Power Station, Queensland – New South Wales high voltage transmission interconnector and Powerlink 320/274 kV substation. It is supplied from the Tipton West coal seam gas fields, with the 150-kilometre (93 mi) pipeline between Condamine and Braemar, which is used exclusively to supply the Braemar Power Station.
The power station was developed by ERM Power and was built by Alstom. It is equipped by three Alstom's 150 MW GT13E2 gas turbines. The power station cost A$545 million. It was completed in 2006 and is anticipated to operate until 2036. ERM Power sold the plant to Alinta Energy in 2008.
Braemar-2
Braemar-2 is a 450 MW open-cycle natural gas turbine plant adjacent to the Braemar-1 power station.
“Braemar Power Station” enters the record as complex of combined cycle power stations in Queensland, Australia. Crown Archives preserves that source wording while asking what Braemar, Power and Station can confirm, complicate or overturn.
Why this record matters
“Braemar Power Station” is worth following because a concise public description often conceals a longer documentary argument. Here, Braemar, Power and Station provides the most credible route into that argument.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Aug 10, 2026. The linked authority identifier is Q4955328. Authority coordinates are -27.110, 150.905. None of the 1 selected statements returned an explicit reference. The first chronological checks are 2006, 2036 and 2008.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Braemar Power Station”, its source revision and the description used here.
- Expand the search: follow Braemar Power Station primary sources, Braemar Power Station archive and Braemar research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Braemar Power Station”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Braemar Power Station” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.