Wukesong Arena
sports arena in Beijing, China

The Wukesong Arena (simplified Chinese: 五棵松体育馆; traditional Chinese: 五棵松體育館; pinyin: Wǔkēsōng Tǐyùguǎn), also known as the Bloomage Biotech Runbaiyan Center (simplified Chinese: 华熙生物·润百颜中心; traditional Chinese: 華熙生物·潤百顏中心; pinyin: Huáxī Shēngwù·Rùnbǎiyán Zhōngxīn) for sponsorship purposes, is a multipurpose indoor arena in Beijing. It was originally built for the 2008 Summer Olympics basketball preliminaries and finals. Ground was broken on 29 March 2005 and construction was completed on 11 January 2008.
The stadium has a capacity of 19,000 and covers an area of 63,000 square metres. It includes a modern, flexible ice hockey rink designed and produced by Finnish rink manufacturer Vepe Oy in November 2016.
The arena was the main venue of the ice hockey tournament during the 2022 Winter Olympics.
History
The stadium was constructed by "Beijing Wukesong Cultural & Sports Co. Ltd." whose five shareholders are Zhongguancun CENCONS Group, Haidian State-owned Assets Investment Co. Ltd, Beijing Urban Construction Group Co. Ltd, Beijing Urban Construction Co.
“Wukesong Arena” enters the record as sports arena in Beijing, China. Crown Archives preserves that source wording while asking what Wukesong, Arena and sports can confirm, complicate or overturn.
Why this record matters
“Wukesong Arena” is worth following because a concise public description often conceals a longer documentary argument. Here, Wukesong, Arena and sports provides the most credible route into that argument.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Aug 31, 2026. The linked authority identifier is Q1321458. Authority coordinates are 39.910, 116.275. 1 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2008, 2005, 2016 and 2022.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Wukesong Arena”, its source revision and the description used here.
- Expand the search: follow Wukesong Arena primary sources, Wukesong Arena archive and Wukesong research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Wukesong Arena”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Wukesong Arena” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.