Baťa's Skyscraper
skyscraper in Zlín, Czech Republic

Baťa's Skyscraper (Czech: Baťův mrakodrap), also known as Building No. 21, is a skyscraper in Zlín, Czechia. It is 77.5 metres high and has sixteen floors. It was the administration building of Bata Shoes, a company that was based in the city. Now it is headquarters of the Zlín Region.
This building was one of the first high-rise buildings to be constructed in Europe: it was the third-tallest pre-war skyscraper after Madrid's Telefónica Building and Antwerp's Boerentoren. The building is in the style of Constructivist architecture, designed by Vladimír Karfík. It was built between 1936 and 1938 at the direction of company president Jan Antonín Baťa, who took over following the death of his half-brother Tomáš Baťa.
Originally, the administration offices were to be concentrated in three interconnected three-story buildings. Architect Karfík suggested the design of a high-rise building and eventually got Jan Antonín Baťa's support for his idea.
The public source identifies “Baťa's Skyscraper” as skyscraper in Zlín, Czech Republic. This brief keeps that definition visible, then builds a research path around Baťa's, Skyscraper and skyscraper.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Baťa's Skyscraper”, the useful work is to connect “skyscraper in Zlín, Czech Republic” to the records capable of establishing context and consequence.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Mar 12, 2026. The linked authority identifier is Q3504366. Authority coordinates are 49.223, 17.658. 2 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1936 and 1938.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Baťa's Skyscraper”, its source revision and the description used here.
- Expand the search: follow Baťa's Skyscraper primary sources, Baťa's Skyscraper archive and Baťa's research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Baťa's Skyscraper”?
- Which institution is responsible for the underlying evidence?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Baťa's Skyscraper” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.