Barsi Light Railway
narrow-gauge railway

Barsi Light Railway (BLR) was a 202-mile (325 km) long, 2 ft 6 in (762 mm) narrow-gauge railway between Miraj and Latur in the state of Maharashtra in India. It was designed by British engineer Everard Calthrop, and regarded as having revolutionised narrow-gauge railway construction in India.
Classification
It was labeled as a Class II railway according to Indian Railway Classification System of 1926.
Background: The Barsi Tramway Project
The Barsee Tramway was a project, proposed in 1862, to construct a bullock driven Tramway 'to connect Barsee with the Barsee railway station’. In the event the Tramway was not installed but the groundwork had been completed with the construction of the earth works, cuttings and bridges and was completed in 1870 [3].
By the 1870’s Barsi had become the spelling of the town. Barsi Town was connected to Barsi Road Station on the GIPR, a distance of 22 mi (35 km), utilising the completed groundworks providing a 24 ft (7.3 m) wide roadway with 'hard shoulders' [4] and designed to be built with sufficient strength to carry locomotives and the gradients which did not exceed 1 in 100 [3]. The Seena (Sina) River bridge was a ten arch masonry constructed bridge.
History
Calthrop worked as a locomotive inspector for the Great Indian Peninsula Railway (GIPR), and in 1886 requested leave to investigate proposals for independent branch lines. He identified two schemes of particular interest – a 5-mile (8 km) tramway connecting the Hindu religious centre of Nasik with the railway, and a 21-mile (34 km) branch line to the town of Barshi.
“Barsi Light Railway” enters the record as narrow-gauge railway. Crown Archives preserves that source wording while asking what Barsi, Light and Railway can confirm, complicate or overturn.
Why this record matters
“Barsi Light Railway” is worth following because a concise public description often conceals a longer documentary argument. Here, Barsi, Light and Railway provides the most credible route into that argument.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jun 3, 2026. The linked authority identifier is Q4864995. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1926, 1862, 1870 and 1886.
The absence of detail may reflect summary conventions rather than a lack of surviving documentation. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Barsi Light Railway”, its source revision and the description used here.
- Expand the search: follow Barsi Light Railway primary sources, Barsi Light Railway archive and Barsi research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Barsi Light Railway”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Barsi Light Railway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.