Ruabon–Barmouth line
UK railway line

The Ruabon–Barmouth line was a standard-gauge line owned by the Great Western Railway across the north of Wales which connected Ruabon, in the east, with Barmouth on the west coast.
History
The line opened in stages by various companies:
Vale of Llangollen Railway – 1 December 1861 (goods); 2 June 1862 (passenger)
Llangollen and Corwen Railway – 1 May 1865. This section of the line had gained royal assent in 1860.
Corwen and Bala Railway – 16 July 1866 (Corwen to Llandrillo); 1 April 1868 (Llandrillo to Bala).
Bala and Dolgelly Railway – 4 August 1868.
Aberystwith and Welsh Coast Railway – 10 October 1867
The Aberystwith and Welsh Coast Railway was absorbed by the Cambrian Railways by the Cambrian and Coast Railways (Amalgamation) Act 1865 (28 & 29 Vict. c. ccxci). The Cambrian Railways amalgamated with the Great Western Railway (GWR) on 1 January 1922 as a result of the Railways Act 1921.
The Bala and Dolgelly Railway was absorbed into the GWR by the Great Western Railway Act 1877 (40 & 41 Vict.
Begin with the source’s own compact description: “Ruabon–Barmouth line” is uK railway line. The dossier treats that line as a proposition to test through Ruabon, Barmouth and line, not as a finished interpretation.
Why this record matters
The phrase “uK railway line” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Jul 5, 2026. The linked authority identifier is Q7375638. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1861, 1862, 1865 and 1860.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Ruabon–Barmouth line”, its source revision and the description used here.
- Expand the search: follow Ruabon–Barmouth line primary sources, Ruabon–Barmouth line archive and Ruabon research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Ruabon–Barmouth line”?
- What terminology or title could unlock a more precise catalogue search?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “Ruabon–Barmouth line” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.