Bakun Dam

embankment dam

Cross-disciplinary reference desk with index cards, atlas, dictionary and catalogue
General referenceInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionSep 4, 2026
Entity authorityQ804548
Source-derived summary

The Bakun Dam (Malay: Empangan Bakun) is an embankment dam located in Belaga District, Kapit Division, Sarawak, Malaysia, on the Balui River, a tributary or source of the Rajang River and some sixty kilometres east of Belaga. As part of the project, the second-tallest concrete-faced rockfill dam in the world would be built. It would generate 2,400 megawatts (MW) of electricity once completed.

The purpose for the dam was to meet growing demand for electricity. However, most of this demand is said to lie in Peninsular Malaysia and not East Malaysia, where the dam is located. Even in Peninsular Malaysia, however, there is an oversupply of electricity, with Tenaga Nasional Berhad being locked into unfavourable purchasing agreements with Independent Power Producers. The original idea was to have 30% of the generated capacity consumed in East Malaysia and the rest transmitted to Peninsular Malaysia. This plan envisioned 730 km of overhead HVDC transmission lines in East Malaysia, 670 km of undersea HVDC cable and 300 km of HVDC transmission line in Peninsular Malaysia.

Future plans for the dam include connecting it to an envisioned Trans-Borneo Power Grid Interconnection, which would be a grid to supply power to Sarawak, Sabah, Brunei, and Kalimantan (Indonesia). There have been mentions of this grid made within ASEAN meetings but no actions have been taken by any party.

Editorial summary

Begin with the source’s own compact description: “Bakun Dam” is embankment dam. The dossier treats that line as a proposition to test through Bakun and embankment, not as a finished interpretation.

Editorial reviewA dependable orientation record for establishing vocabulary, names and a first evidence trail. The current 222-word lead offers orientation but no explicit four-digit date, so chronology should not be assumed. The selected authority fields contribute no independent date. For this dossier, Bakun and embankment is the immediate research focus.
Editorial analysis

Why this record matters

The phrase “embankment dam” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.

Evidence profile

Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Sep 4, 2026. The linked authority identifier is Q804548. Authority coordinates are 2.760, 114.056. 1 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank.

Critical limits

Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.

Best used for
  • Subject orientation
  • Search vocabulary
  • Locating named sources
Verify next

The closest primary source, responsible institution and strongest cited specialist reference.

Three-step research path

  1. Establish the record: confirm the title “Bakun Dam”, its source revision and the description used here.
  2. Expand the search: follow Bakun Dam primary sources, Bakun Dam archive and Bakun research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Bakun Dam”?
  2. What terminology or title could unlock a more precise catalogue search?
  3. Which cited source is closest to the event, object or claim?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from Bakun Dam” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.