Baishan Dam
dam

The Baishan Dam (Chinese: 白山大坝, meaning: "White Mountain Dam") is an arch-gravity dam on the Second Songhua River near the town of Baishanzhen, Huadian, Jilin Province, China. The purpose of the dam is hydroelectric power generation and flood control. The dam supplies water to five turbine-generators in two different powerhouses for an installed capacity of 1,500 megawatts (2,000,000 hp) while it can also control a design 19,100-cubic-metre-per-second (670,000 cu ft/s) flood. Additionally, it has a 300-megawatt (400,000 hp) pumped-storage hydroelectric generation capacity. It is named after Baekdu Mountain (White Mountain), near the city of Baishan.
Construction
Construction on the dam began in May 1975, the reservoir began to fill on September 16, 1982, and by the end of 1984, the first phase of three generators was operational. Another two generators in the project's second phase were operational by 1992. The dam submerged an area of 17.67 square kilometres (6.82 sq mi), displacing about 10,300 people.
In March 2000, a feasibility study report on a pumped-storage capability for the dam was approved. In August 2002, construction started on installing two 150 MW reversible pump generators and by July 2006, they were operational.
“Baishan Dam” enters the record as dam. Crown Archives preserves that source wording while asking what Baishan can confirm, complicate or overturn.
Why this record matters
“Baishan Dam” is worth following because a concise public description often conceals a longer documentary argument. Here, Baishan provides the most credible route into that argument.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jul 1, 2026. The linked authority identifier is Q803971. Authority coordinates are 42.726, 127.224. 2 of 2 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1975, 1982, 1984 and 1992.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Baishan Dam”, its source revision and the description used here.
- Expand the search: follow Baishan Dam primary sources, Baishan Dam archive and Baishan research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Baishan Dam”?
- What terminology or title could unlock a more precise catalogue search?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Baishan Dam” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.