Bad Krozingen–Münstertal railway
railway line

The Bad Krozingen and Münstertal Railway, also the Münstertal Railway (German: Münstertalbahn), is a branch line in Baden-Württemberg, in southwest Germany, running from Bad Krozingen to Münstertal (Schwarzwald) in the Black Forest. In Bad Krozingen the link has a junction with the Rhine Valley Railway. The owner and operator of the Münstertal Railway is the Südwestdeutsche Verkehrs-Aktiengesellschaft (SWEG). Its depot is located in the station at Staufen. Passenger traffic on the former branch to Sulzburg was closed in 1969.
Route
The line runs mostly through fields, meadows and woodlands. The line begins in Bad Krozingen and runs via Oberkrozingen to Staufen. There the line formed two branches. The southern branch (which was the original branch and is now disused) ran via Grunern and Ballrechten-Dottingen to Sulzburg. The northern branch runs via Etzenbach and Dietzelbachstraße to Münstertal.
This brief starts where responsible research should: with the source description of “Bad Krozingen–Münstertal railway” as railway line. Everything that follows is an evidence route, not borrowed authority.
Why this record matters
The subject matters to the general reference register because the source frames it as railway line. Its deeper value depends on whether names, dates, institutions and citations support that framing.
Named sources, stable identifiers and responsible institutions provide the strongest route from overview to verifiable evidence. The source revision retrieved here is dated Oct 31, 2024. The linked authority identifier is Q895607. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 1969.
A concise general-reference account can conceal disagreements about scope, terminology or the weight assigned to individual sources. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Bad Krozingen–Münstertal railway”, its source revision and the description used here.
- Expand the search: follow Bad Krozingen–Münstertal railway primary sources, Bad Krozingen–Münstertal railway archive and Krozingen research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Bad Krozingen–Münstertal railway”?
- Which cited source is closest to the event, object or claim?
- What terminology or title could unlock a more precise catalogue search?
Search terms from this dossier
This entry incorporates text from “Bad Krozingen–Münstertal railway” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.