CACrown ArchivesThe cinema collection
Menu
Research dossier · Science & Nature

Australian Renewable Energy Hub

planned Renewable energy plant

Specimen drawers, botanical folios and brass scientific instruments under study light
Science and natureInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionSep 1, 2025
Entity authorityQ104869813 ↗
Source-derived summary

The Australian Renewable Energy Hub, formerly Asian Renewable Energy Hub (AREH), is a proposal to create one of the world's largest renewable energy plants in the Pilbara region of Western Australia. After several revisions of the original project concept, in January 2023 the Government of Western Australia approved a revised set of seven projects, totalling 26 GW of wind and solar capacity that would be used to produce green hydrogen, to be exported by converting it to ammonia.

History

The Asian Renewable Energy Hub was first proposed in 2014, with plans for the project concept changing several times since then. The project initially aimed to supply power via an undersea power cable (to Indonesia and perhaps on to Singapore) with a capacity of 15 gigawatts (GW), using four cables, each 3,000 km (1,900 mi) long. However, having explored the potential of exporting green hydrogen via the manufacture of ammonia, it was able to aim for an extra 11GW. The Government of Western Australia gave environmental approval for phase one of the project (15,000 megawatts (MW) of power generation, across 6,500 km2 (2,500 sq mi) in October 2020.

Given the status of "major project" by the federal government in October 2020, the proposed development of the plant enables the goals set under the Western Australian Renewable Hydrogen Strategy to be brought forward from 2040 to 2030.

After a revised proposal was submitted to the Australian Government, in June 2021 Minister for the Environment Sussan Ley ruled this plan unacceptable owing to its potential impact on threatened migratory species and internationally significant wetlands in the area. Eighty Mile Beach is a RAMSAR listed site which provides habitat for several threatened species of migratory birds and a large population of waterbirds, which would be disrupted by the marine components of the project, which would affect tidal movements. The consortium continue to work on the environmental impact plans and mitigation measures.

As of June 2022, the project developers BP, Intercontinental Energy, CWP Global, Vestas, and Pathway Investments were planning to build a mixture of wind power and solar energy power generators which would generate up to 26GW of power.

Editorial summary

“Australian Renewable Energy Hub” enters the record as planned Renewable energy plant. Crown Archives preserves that source wording while asking what Australian, Renewable and Energy can confirm, complicate or overturn.

Editorial reviewUseful for establishing the present vocabulary of the subject while preserving a route back to the evidence on which that vocabulary rests. The current lead gives the account dated anchors—2023, 2014, 2020, 2040—that can be checked directly. The selected authority fields contribute no independent date. Its strongest next move is a source search built around Australian, Renewable and Energy.
Editorial analysis

Why this record matters

“Australian Renewable Energy Hub” is worth following because a concise public description often conceals a longer documentary argument. Here, Australian, Renewable and Energy provides the most credible route into that argument.

Evidence profile

The date and method of observation matter as much as the stated conclusion, especially where classification or consensus has changed. The source revision retrieved here is dated Sep 1, 2025. The linked authority identifier is Q104869813. None of the 0 selected statements returned an explicit reference. The first chronological checks are 2023, 2014, 2020 and 2040.

Critical limits

Scientific names, classifications and consensus can change while older terminology persists in catalogues and historical literature. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Check terminology, classification and the date of the cited evidence. Scientific names and technical consensus can change while older records retain historical value.

Best used for
  • Current terminology
  • Classification context
  • Finding cited technical literature
Verify next

Primary datasets, specimen catalogues, standards bodies and the most recent peer-reviewed literature.

Three-step research path

  1. Establish the record: confirm the title “Australian Renewable Energy Hub”, its source revision and the description used here.
  2. Expand the search: follow Australian Renewable Energy Hub primary sources, Australian Renewable Energy Hub archive and Australian research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Australian Renewable Energy Hub”?
  2. Which observation, specimen, dataset or publication supports the account?
  3. Has classification or technical consensus changed since the cited source?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Australian Renewable Energy Hub” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.