CACrown ArchivesThe cinema collection
Menu
Research dossier · Places & Architecture

Arakawa-nichōme Station

tram station in Arakawa, Tokyo, Japan

Architectural plans, a scale model, maps and brass measuring instruments
Places and architectureInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionAug 23, 2026
Entity authorityQ11618522 ↗
Source-derived summary

Arakawa-nichome Station (荒川二丁目停留場, Arakawa-nichōme-teiryūjō) is a tram station operated by Toei's Tokyo Sakura Tram located in Arakawa, Tokyo Japan. It is 1.0 kilometre from the terminus of the Tokyo Sakura Tram at Minowabashi Station.

Layout

Arakawa-nichome Station has two opposed side platforms.

Surrounding area

Arakawa Sizen Park . Yuinomori Arakawa (library and community facility).

Editorial summary

Begin with the source’s own compact description: “Arakawa-nichōme Station” is tram station in Arakawa, Tokyo, Japan. The dossier treats that line as a proposition to test through Arakawa-nichōme, Station and tram, not as a finished interpretation.

Editorial reviewMost useful as a place-based finding aid connecting the present description to earlier jurisdictions, maps and built evidence. The current 54-word lead offers orientation but no explicit four-digit date, so chronology should not be assumed. The linked authority record independently contributes the date 1913-04-01. For this dossier, Arakawa-nichōme, Station and tram is the immediate research focus.
Editorial analysis

Why this record matters

The phrase “tram station in Arakawa, Tokyo, Japan” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.

Evidence profile

Place names and jurisdictional language are key evidence: both can reveal earlier catalogue descriptions and overlooked record series. The source revision retrieved here is dated Aug 23, 2026. The linked authority identifier is Q11618522. Authority coordinates are 35.739, 139.785. 1 of 3 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank.

Critical limits

Modern boundaries and familiar names can conceal earlier jurisdictions or structures that do not align with the present site. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.

Best used for
  • Historic place names
  • Jurisdictional context
  • Routes into maps and plans
Verify next

Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.

Three-step research path

  1. Establish the record: confirm the title “Arakawa-nichōme Station”, its source revision and the description used here.
  2. Expand the search: follow Arakawa-nichōme Station primary sources, Arakawa-nichōme Station archive and Arakawa-nichōme research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “Arakawa-nichōme Station”?
  2. What physical evidence or contemporary plan supports the description?
  3. Which authority defined the place, boundary or structure at the relevant date?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from “Arakawa-nichōme Station” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.