COCOMO

model for estimating the time and cost of software development

Specimen drawers, botanical folios and brass scientific instruments under study light
Science and natureInterpretive dossier study · Crown Archives visual atlas
Record originEnglish Wikipedia
Text licenseCC BY-SA 4.0
Source revisionJan 4, 2026
Entity authorityQ1023952
Source-derived summary

The Constructive Cost Model (COCOMO) is a parametric software cost estimation model developed by Barry W. Boehm. The model parameters are derived from fitting a regression formula using data from historical projects (63 projects for COCOMO 81 and 161 projects for COCOMO II).

History

The constructive cost model was developed by Barry W. Boehm in the late 1970s and published in Boehm's 1981 book Software Engineering Economics as a model for estimating effort, cost, and schedule for software projects. It drew on a study of 63 projects at TRW Aerospace where Boehm was Director of Software Research and Technology. The study examined projects ranging in size from 2,000 to 100,000 lines of code, and programming languages ranging from assembly to PL/I. These projects were based on the waterfall model of software development which was the prevalent software development process in 1981.

References to this model typically call it COCOMO 81. In 1995 COCOMO II was developed and finally published in 2000 in the book Software Cost Estimation with COCOMO II. COCOMO II is the successor of COCOMO 81 and is claimed to be better suited for estimating modern software development projects; providing support for more recent software development processes and was tuned using a larger database of 161 projects. The need for the new model came as software development technology moved from mainframe and overnight batch processing to desktop development, code reusability, and the use of off-the-shelf software components.

COCOMO consists of a hierarchy of three increasingly detailed and accurate forms. The first level, Basic COCOMO is good for quick, early, rough order of magnitude estimates of software costs, but its accuracy is limited due to its lack of factors to account for difference in project attributes (Cost Drivers).

Editorial summary

“COCOMO” enters the record as model for estimating the time and cost of software development. Crown Archives preserves that source wording while asking what COCOMO, model and estimating can confirm, complicate or overturn.

Editorial reviewUseful for establishing the present vocabulary of the subject while preserving a route back to the evidence on which that vocabulary rests. The current lead gives the account dated anchors—1981, 1995, 2000—that can be checked directly. The selected authority fields contribute no independent date. Its strongest next move is a source search built around COCOMO, model and estimating.
Editorial analysis

Why this record matters

“COCOMO” is worth following because a concise public description often conceals a longer documentary argument. Here, COCOMO, model and estimating provides the most credible route into that argument.

Evidence profile

Stable identifiers, scientific names and standards terminology offer the best bridge between this overview and specialist evidence. The source revision retrieved here is dated Jan 4, 2026. The linked authority identifier is Q1023952. The first chronological checks are 1981, 1995 and 2000.

Critical limits

A general summary may omit uncertainty, sample limits or methodological disagreement that is explicit in the technical record. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.

How to read it

Check terminology, classification and the date of the cited evidence. Scientific names and technical consensus can change while older records retain historical value.

Best used for
  • Current terminology
  • Classification context
  • Finding cited technical literature
Verify next

Primary datasets, specimen catalogues, standards bodies and the most recent peer-reviewed literature.

Three-step research path

  1. Establish the record: confirm the title “COCOMO”, its source revision and the description used here.
  2. Expand the search: follow COCOMO primary sources, COCOMO archive and COCOMO research across catalogues and specialist indexes.
  3. Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.

Questions for further research

  1. Which source most directly establishes the central claim about “COCOMO”?
  2. Has classification or technical consensus changed since the cited source?
  3. Which observation, specimen, dataset or publication supports the account?
Subject index

Search terms from this dossier

Source & attribution

This entry incorporates text from COCOMO” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.