INS Aditya
1993 Aditya-class replenishment and repair ship

INS Aditya (A59) is an Aditya-class replenishment and repair ship in service with the Indian Navy. The ship was launched on 15 November 1993 and commissioned on 3 April 2000.
Aditya is a fully air-conditioned and lengthened version of the original Deepak class, but with a multipurpose workshop and with four replenishment at sea (RAS) stations alongside. The ship was built at Garden Reach Shipbuilders and Engineers (GRSE). Building progress was very slow and the ship was plagued by propulsion problems, during her sea trials in September 1999.
Description
The ship has a cargo capacity of 2,250 m3 (79,000 cu ft) water, 2,170 m3 (77,000 cu ft) ammunition and stores and 14,200 m3 (500,000 cu ft) diesel and aviation kerosene. The ship can carry 12,000 tons of liquid cargo, comprising LSHSD, aviation kerosene, distilled and fresh water and 5,000 tons of solid cargo. The ship features a Hallapa deck and Canadian Hepburn RAS equipment. Aditya is also equipped with a 2-ton heavy jackstay and a 20-ton crane. It can replenish four warships and one rotor aircraft simultaneously and was designed to be able to serve as command and control platform.
Begin with the source’s own compact description: “INS Aditya” is 1993 Aditya-class replenishment and repair ship. The dossier treats that line as a proposition to test through Aditya, Aditya-class and replenishment, not as a finished interpretation.
Why this record matters
The phrase “1993 Aditya-class replenishment and repair ship” supplies a clear boundary for inquiry. It also exposes the unanswered questions: who defined that boundary, when it became stable and which sources sit outside it.
The citation trail is more important than the brevity of the summary: it shows where individual claims can be examined in context. The source revision retrieved here is dated Jul 18, 2026. The linked authority identifier is Q3094332. None of the 0 selected statements returned an explicit reference. The first chronological checks are 1993, 2000 and 1999.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “INS Aditya”, its source revision and the description used here.
- Expand the search: follow INS Aditya primary sources, INS Aditya archive and Aditya research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “INS Aditya”?
- Which institution is responsible for the underlying evidence?
- Which cited source is closest to the event, object or claim?
Search terms from this dossier
This entry incorporates text from “INS Aditya” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.