Adelanto Converter Station
Converter station in California, United States

Adelanto Converter Station in Adelanto, California, is the southern terminus of the 2,400 MW Path 27 Utah–California high voltage DC power (HVDC) transmission line. The station contains redundant thyristor-based HVDC converters rated for 1,200 MW continuous or 1,600 MW short term overload. The 300-acre (120 ha) station was completed in July, 1986 at a cost of US$131 million. The northern terminus of Path 27 is fossil fueled Intermountain Power Plant in Utah.
An adjacent $45 million AC switching station owned by Los Angeles Department of Water and Power links to the Southern California grid via five 500-kV AC lines.
ABB, who had built the station in 1986, upgraded its original 1,600 MW capacity to 2,400 MW in 2011.
In 2012, an 11.4 MW solar array (less than 1% of the Utah plant's capacity) was installed at the facility at a cost of $48 million obtained with loans subsidized by the American Recovery and Reinvestment Act of 2009.
The public source identifies “Adelanto Converter Station” as converter station in California, United States. This brief keeps that definition visible, then builds a research path around Adelanto, Converter and Station.
Why this record matters
A short description can identify a subject without explaining its stakes. For “Adelanto Converter Station”, the useful work is to connect “converter station in California, United States” to the records capable of establishing context and consequence.
Maps, plans, fabric surveys and administrative records can establish how the site’s name, extent and function changed over time. The source revision retrieved here is dated Jun 8, 2026. The linked authority identifier is Q23016607. Authority coordinates are 34.551, -117.437. 2 of 3 selected statements include explicit references; 1 carry qualifiers and 0 use preferred rank. The first chronological checks are 1986, 2011, 2012 and 2009.
Architectural summaries often privilege surviving fabric and can understate demolished phases, contested use or displaced communities. The lead is largely declarative, so disagreement and counter-evidence require a deliberate search beyond the opening account. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Treat names, boundaries and functions as historically changeable. Maps, plans, inventories and administrative records can clarify what the place meant at different dates.
- Historic place names
- Jurisdictional context
- Routes into maps and plans
Contemporary maps, plans, listed-building records, estate papers and the responsible local or national archive.
Three-step research path
- Establish the record: confirm the title “Adelanto Converter Station”, its source revision and the description used here.
- Expand the search: follow Adelanto Converter Station primary sources, Adelanto Converter Station archive and Adelanto research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Adelanto Converter Station”?
- Which earlier names or jurisdictions may reveal additional records?
- What physical evidence or contemporary plan supports the description?
Search terms from this dossier
This entry incorporates text from “Adelanto Converter Station” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.