Acholibur–Gulu–Olwiyo Road
road in Uganda

The Acholibur–Gulu–Olwiyo Road is a road in the Northern Region of Uganda, connecting the town of Acholibur to the city of Gulu and the town of Olwiyo.
Location
The road starts at Acholibur, a small town on the Kitgum–Lira road, approximately 19 kilometres (12 mi) south of Kitgum. The road continues in a southwesterly direction to Gulu (2014 population: 152,276), the most populous city in the Northern Region. The road then continues through Nwoya and Anaka to end at Olwiyo in Nwoya District, a distance of about 150 kilometres (93 mi). The road connects the districts of Kitgum, Pader, Gulu, and Nwoya. The coordinates of the road near Gulu are 2°48'24.0"N, 32°19'29.0"E (Latitude:2.806667; Longitude:32.324722).
Upgrading to bitumen
In 2009, the Ugandan government commissioned a feasibility study and detailed engineering design for this road and the Rwekunye–Apac–Aduku–Lira–Kitgum–Musingo Road, both in northern Uganda. The reports became available in 2013. On 21 February 2015, the upgrade from unsealed gravel surface to class II bitumen surface was commissioned by President Yoweri Museveni. The work on the 73 kilometres (45 mi) from Acholibur to Unyama is assigned to China Railway No.5 Engineering Group.
“Acholibur–Gulu–Olwiyo Road” enters the record as road in Uganda. Crown Archives preserves that source wording while asking what Acholibur, Gulu and Olwiyo can confirm, complicate or overturn.
Why this record matters
“Acholibur–Gulu–Olwiyo Road” is worth following because a concise public description often conceals a longer documentary argument. Here, Acholibur, Gulu and Olwiyo provides the most credible route into that argument.
Vocabulary and entity names are the principal evidence signals here, because they determine the precision of every later search. The source revision retrieved here is dated Jun 6, 2026. The linked authority identifier is Q25052873. Authority coordinates are 2.951, 32.271. 1 of 1 selected statements include explicit references; 0 carry qualifiers and 0 use preferred rank. The first chronological checks are 2014, 2009, 2013 and 2015.
Overview language is designed for orientation and should not be treated as a substitute for the evidence cited beneath it. The source lead contains qualifying language; that uncertainty should survive quotation, summary and reuse. Authority statements aid reconciliation but still require their own references, qualifiers and ranks to be checked.
How to read it
Use the entry as an orientation point, then follow its citations and revision history. Names, dates and institutional relationships should be checked against the original record.
- Subject orientation
- Search vocabulary
- Locating named sources
The closest primary source, responsible institution and strongest cited specialist reference.
Three-step research path
- Establish the record: confirm the title “Acholibur–Gulu–Olwiyo Road”, its source revision and the description used here.
- Expand the search: follow Acholibur–Gulu–Olwiyo Road primary sources, Acholibur–Gulu–Olwiyo Road archive and Acholibur research across catalogues and specialist indexes.
- Test the account: compare the strongest cited source with the responsible institution’s current record and note any disagreement.
Questions for further research
- Which source most directly establishes the central claim about “Acholibur–Gulu–Olwiyo Road”?
- Which cited source is closest to the event, object or claim?
- Which institution is responsible for the underlying evidence?
Search terms from this dossier
This entry incorporates text from “Acholibur–Gulu–Olwiyo Road” on English Wikipedia. Contributors are listed in the page history. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License. Selected authority identifiers and statements are retrieved from Wikidata under CC0; their references and qualifiers remain part of the verification path.